We deliver structures and equipment assemblies for the demanding offshore industry that meet the strictest safety, quality, and certification requirements.

Our extensive experience with products used in marine environments is particularly evident in precise manufacturing as well as documented and traceable processes.

Our production covers both individual components and large assemblies designed to withstand corrosion, vibration, dynamic loads, and varying operating conditions.

High-pressure vessels and pressure equipment (PED, ASME)

Offshore structures (Norsok)

Subsea structures (Norsok)

Cranes and lifting/handling equipment

Fire protection systems and stations

Piping systems

Non-pressurized tanks

CASE: Petrobras P-84 – P-85

Project deliveries

Parallel FPSO units under construction in the Santos Basin, Brazil. Daily production capacity: 225,000 barrels of oil and 10,000,000 cubic meters of natural gas.

We supplied components for fire water pumping systems for demanding offshore applications. In the oil and gas industry, preventing the spread of fire is critical.

Framo’s fire water pumping systems are among the fastest-responding and most reliable firefighting solutions on the market – trusted for over four decades.

Scope of delivery

• Structures for fire water pumping systems

CASE: Aker Valhall

Project deliveries

Valhall is a major oil and gas field in the southern North Sea operated by Aker BP. The field has been in production since 1982 and is undergoing a major modernization through the Valhall PWP – Fenris development project, aimed at extending its operational life by several decades. The project includes constructing a new production and wellhead platform and developing the Fenris field, while utilizing power from shore to reduce emissions.

We supplied components for fire water pumping systems for demanding offshore applications. In the oil and gas industry, preventing the spread of fire is critical.

Framo’s fire water pumping systems are among the fastest-responding and most reliable firefighting solutions on the market – trusted for over four decades.

Scope of delivery

• Structures for fire water pumping systems

The five corner stones of our work

Exceptionally large modular production facilities

Our two large factories and modularity enable greater capacity for individual projects, regardless of their duration. The additional space in our factory eliminates the need for extra logistics or external warehousing. Modularity and space mean factories within a factory.

1

Material supply

Proactive material sourcing and in-house warehousing combined with in-house further processing significantly reduces delays in our customer projects. This means reliable delivery.

2

Data

Our experience and development in collecting production data facilitates sustainability and compliance reporting for our customers. Data sharing can be customised according to customer and project needs. To us, sustainability is concrete.

3

Experience and expertise

We are familiar with the specific characteristics and requirements of various industries. We adapt our process to the customer's needs – not the other way around. Our modern and adaptable production process scales effectively and enables predictable project management, regardless of production volumes. Project simulation, stage by stage, allows for proactive scheduling and resource planning. The customer gets what they order, for the agreed-upon price.

4

Maritime access

Post-production logistics do not have to take place on land. Our production facilities have direct access to maritime routes, along which even large and oddly shaped equipment can be delivered anywhere in the world. To put it shortly – we’re located right by a port.

5